A full siding replacement usually follows several major stages.
Step 1: Consultation and measurementsThe contractor inspects the house, discusses materials, and measures the exterior.
Step 2: Product and color selectionYou select the siding style, profile, texture, trim, and color.
Step 3: Preconstruction preparationMaterials are ordered, access is planned, and any required administrative steps are completed.
Step 4: Removal of old sidingThe crew removes the existing siding and exposes the underlying wall assembly.
Step 5: Inspection and repairsDamaged sheathing, framing, flashing, or trim is identified and addressed.
Step 6: Weather protectionThe crew installs or repairs the required water-management components.
Step 7: New siding installationThe siding and trim are installed according to the selected system and project specifications.
Step 8: Painting and finishingField-painted materials are finished, and joints and penetrations are completed as required.
Step 9: Cleanup and inspectionThe crew removes debris, reviews the installation, and completes final corrections.
Read
What to Expect: A Step-by-Step Guide to Siding Installation for a more detailed explanation.
You can also review the
Siding Installation Portland Guide 2026. Many of its recommendations regarding contractor selection, preparation, water management, and installation quality also apply to Seattle-area homes.